METHODIST CHURCH (Pic 1 inside new part)
The Methodist congregation was very proud to have a new church built in 1994 which can accommodate 150 people. The majority of funding came from the local congregation with contributions from the Joseph Rank Trust and the Methodist Property Division.
|